OVERVIEW
Innovation
Airport Capacity Enhancement (ACE) is a national program commissioned by Airservices to address the growing demand at Australia’s major airports – Sydney, Brisbane, Melbourne, Perth, and most recently ACE has been established in Adelaide. ACE is known as the Sydney ATM Strategic Planning Group (SASPG) in Sydney.
ACE identifies opportunities to improve the efficiency and use of existing infrastructure in order to increase runway capacity, that is, it aims to maximise the airport’s latent capacity. This involves improving processes and practices of ATC, airport operators and airlines. Changes and improvements to infrastructure can also be considered, but optimising existing infrastructure is the initial objective.
ACE follows the European ACE model and is based on a principal of broad collaboration and cooperation within the airport community to address the challenge of airport congestion and delay. Within the Australian aviation environment, ACE is led by Airservices.
DOWNLOADABLES
Strategic plans
Strategic Plans were developed for each participating airport focusing on:
- improving arrival spacing
- standardising terminal arrival speeds
- reducing runway occupancy times and pilot response times
- improving communication between airport partners
- many of these improvement initiatives have been completed, and a summary of the performance improvements were identified in
- operational Performance Assessments undertaken by UK NATS at Brisbane in February 2014 and at Melbourne and Perth in October 2014.
INITIATIVES
Achievements
A number of operational performance requirements associated with important capacity and efficiency initiatives are now procedures in AIP/DAP:
- Airport Efficiency in DAP for ML, BN, SY, PH. This is a page devoted to expected pilot behaviour and performance on the RWY and includes preferred exit taxiways for arriving aircraft.
- Standard Terminal Area Arrival Speeds (STAAS) for ML, BN, SY, PH and AD (AIP ENR 1.5 – 45 para 11). The objective is to provide predictable spacing and speeds on final, optimising arrival sequencing and assisting efficient departure management.
- Feeder Fix Flow (AIP ENR 1.9 – 5 para 4). Details feeder fix flow and provides expectations in regard to accuracy of the aircraft’s time over feeder fix.
INITIATIVES
Operational Performance Improvements
As well as the initiatives included in the Strategic Plans, ACE/SASPG undertakes a number of other improvement initiatives.